-
1.Do you have factory?
Yes, we owning the largest producing base in the south of China, our factory is located in Nansha district, Guangzhou city, we can test water fountain show and water screen movie show to our dear client, welcome your kind visit anytime!
-
2.Where is your office?
Our office is located in Tianhe district, Guangzhou city, near to metro, nearest metro station is Yantang Exit C, you can take line 3 or 6 to be here.Most of our designers and office staff stay here to support water show Pre-sales service, welcome your kind visit.
-
3.What services can you offer?
We offer one stop service on water show project from fountain design, fountain manufacturing,installation guidance on site and maintenance training, 24 months warranty and life long technical support.
-
4.What do you need to do fountain design proposal?
a. Fountain site(Lake or river, pool or floor fountain.photos to show is better)
b. Fountain size & water depth( diameter, length & width. Autocad drawing is better)
c. Fountain type: musical dancing fountain or non-music
d. Water quality: salty water or fresh water
e. Voltage & HZ for fountain zone(one phase or 3 phase)
f. Target budget(lt is the most efficient way for us to offer proper design)
g. Other special requirements
-
5.Can your people go abroad for installation?
Yes, we own 40 people installation team (all of them own oversea installation experience), so we can arrange engineers to your country for guiding installation and programming and debugging and training operation & after sale service.
-
6.Can you offer prices for one set fountain?
Fountain project is customized, each project is different, we can do much proper design proposal with rational cost for you according to your needs and site situation.
-
7.Is your design proposal free?
We can offer plan design, 3D design includes 3D images and animation video.
Plan design is for free, 3D design need to be charged and then deducted from order once the project was confirmed.
-
8.How long time does the design take?
Plan design:1-3days
3D image:1-3days
Animation video:3-7days
-
9.What's the lead time?
Generally the lead time is 25-40 days after received advance payment.
Get the latest price? We'll respond as soon as possible(within 12 hours)