Equipment Loading of Nigeria 65*14M Pool Music Fountain Project
Equipment Loading of Nigeria 65*14M Pool Music Fountain Project
Forklift operation, handling and sorting of fountain equipment:
Forklift delivers the fountain equipment to the container:
Arrange the fountain equipment manually and make full use of the space:
At this time, the music fountain equipment is half loaded:
Irregular fountain pipeline equipment is not easy to load, which is time-consuming:
After a few hours until dark, all the fountain equipment was finally loaded, and the container almost full:
Let's look forward to the final effect after the music fountain equipment arrives at the site and is installed.
Get the latest price? We'll respond as soon as possible(within 12 hours)
more products
News
Products
Featured Products
Contact Details